Location:
Bloomington, MN

Client:
McGough Construction

Scope:
Demolition, Earthwork, Site Utilities, soil retention

  • 55,000 cy of granular soils export
  • 16,000 cy of cut and fill on site
  • 70,000 SF of parking ramp area prepped
  • 10,000 SF of soil retention installed
  • 1700 LF of water main installed vi. 1400 LF of sanitary sewer installed 
  • 1500 LF of storm water piping installed 
  • 2 large stormwater infiltration systems installed